Salomó prepares a solar plant with 3,120 panels and 2.1 MW of power: what will change in the territory?
Works on the TV-3421 between Roquetes and Mas de Barberans with 3.3 MEUR: widened bridge and pacified crossing
Repowering of the Tortosa wind farm: 3 large turbines in the protected Cardó-Boix area without a fauna study