La Ràpita strengthens the Horta Vella school with a concrete wall to prevent future floods

The Ràpita City Council will invest 33,328 euros in a wall to protect the Horta Vella school after the floods last October.
Mur de formigó recent construït a l escola Horta Vella de La Ràpita per protegir contra futures inundacions — Imagen de la Fuente
Recently built concrete wall at the Horta Vella school in La Ràpita to protect against future floods — Source Image

The Ràpita Town Hall will build a concrete wall in the courtyard of the Horta Vella school to protect it from future floods. The measure comes after the center suffered serious damage during the flash floods of October 12, 2025, which put the safety of students and the infrastructure at risk.

The vulnerability of the school grounds to the overflow of the nearby ditch has made urgent action necessary to prevent this scenario from repeating. With an execution budget of 33,328.75 euros, the project already has technical approval and is expected to improve the center’s safety.

The protection project at Horta Vella school

What does the new concrete wall entail?

The wall will be located on the northern edge of the school grounds and will serve as a physical barrier against waters that might overflow from the nearby ditch. This will protect the courtyard and reduce the risk of water entering the facilities, enhancing the safety of students and the operation of the center.

Why is it key for residents and the school?

It is a necessary step because the educational center is a nerve point of the community and its operation affects families, teachers, and all of Ràpita. Preventing new floods avoids additional expenses and disruptions that affect school routines and the nearest neighbors.

Technical and budgetary details of the work

What investment is allocated and how was it approved?

The cost of the work has been set at 33,328.75 euros, an amount that already has official technical approval to contract the construction. This figure reflects the need for a solid and lasting solution to protect the center and prevent future damage.

What elements are included in the technical document?

The document includes the specifications of the wall, materials to be used, and the exact location to ensure maximum effectiveness. It also includes safety and sustainability criteria so that the infrastructure is resistant and compatible with the school environment.

Context and local impact

How do floods affect Ràpita?

The flash floods last October exposed the fragility of areas like Horta Vella school in the face of intense rain episodes. These situations generate insecurity, school interruptions, and problems for families who depend on the center.

What does this action mean for the future?

With this wall, Ràpita takes a step forward to protect key facilities and minimize the impact of weather events. Residents gain peace of mind, and the school ensures a more stable environment for children's education.

Aspect Detail
Location Northern limit of the Horta Vella school grounds
Work cost 33,328.75 euros
Objective Reduce vulnerability to flooding
Approval date Published in the DOGC in July 2026

The construction of the wall is not just work, but a commitment by the Town Hall to the safety and well-being of citizens. And that is no small matter when the future of a school and the peace of an entire community are at stake.

Source of the article: Editorial | ACN