<?xml version="1.0" encoding="UTF-8"?><rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" version="2.0" xmlns:media="http://search.yahoo.com/mrss/">

<channel>
  <title><![CDATA[Modernet — Motor, tech, gastronomia i ruta :: Latest News - Economy]]></title>

    <link>https://www.modernetdigital.cat/en/</link>
    <description><![CDATA[Diari digital de motor i tech: proves de cotxes, novetats de tecnologia, trucs de cuina i supermercat, i rutes i escapades per carretera.]]></description>
    <lastBuildDate>Thu, 30 Jul 2026 22:00:13 +0200</lastBuildDate>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <generator>https://www.opennemas.com</generator>
    <atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="self" type="application/rss+xml" href="https://www.modernetdigital.cat/en/rss/finance/" />

    <image>
      <title><![CDATA[Modernet — Motor, tech, gastronomia i ruta :: Latest News - Economy]]></title>
        <url>https://www.modernetdigital.cat/media/modernetdigital/images/2025/07/10/2025071013320314137.png</url>
      <link>https://www.modernetdigital.cat/en/</link>
    </image>

                  <item>
  <title><![CDATA[Salomó prepares a solar plant with 3,120 panels and 2.1 MW of power: what will change in the territory?]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/salomo-prepares-solar-plant-with-3120-panels-and-21-mw-power-that-will-change-territory/20260708082226016780.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/salomo-prepares-solar-plant-with-3120-panels-and-21-mw-power-that-will-change-territory/20260708082226016780.html#comentarios-16780</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/salomo-prepares-solar-plant-with-3120-panels-and-21-mw-power-that-will-change-territory/20260708082226016780.html</guid>
  <pubDate>Wed, 8 Jul 2026 08:22:26 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[In Salomó, 3,120 solar panels will be installed in a 2.1 MW plant that will transform the landscape. Discover details and local impacts.]]></description>
        <content:encoded><![CDATA[<p><strong>A photovoltaic plant with more than 3,000 solar panels and a power of 2.1 MW is being driven forward in Salomó.</strong> The SALOMÓ PSF 1 project plans an installation on non-developable land with inverters and a high-voltage line. This new renewable energy infrastructure is already in public process.</p>

<p>Many residents will wonder how this new photovoltaic plant will affect their immediate surroundings and the landscape of the region, but above all what consequences it will have for the local energy transition. Here we explain everything you need to know.</p>

<h2>Technical details of the photovoltaic project in Salomó</h2>

<h3>What exactly does the SALOMÓ PSF 1 plant include?</h3>

<p>The project includes the installation of 3,120 solar panels with a single-axis tracking system, which improves energy efficiency by following the sun throughout the day.</p>

<p>In addition, 6 inverters will be installed to manage the power, which reaches 2.3088 MWp and 2.1 MW, all located on non-developable land, avoiding residential areas.</p>

<h3>Where will the plant connect and what will its scope be?</h3>

<p>To ensure electrical connection, a 25 kV underground high-voltage line 1,414 meters long and a final aerial section of 65 meters will be created, linked to the Perafort substation.</p>

<p>This ensures the entry of the generated energy into the local electrical grid, contributing to the demand of the Tarragona-Tarragonès area.</p>

<h2>Social and territorial impact of the new solar plant</h2>

<h3>What visual and environmental change will it imply for Salomó?</h3>

<p>The number of panels and the surface it will occupy will alter the traditional rural landscape, a fact that generates diverse opinions among the residents.</p>

<p>However, the installation bets on clean energy that can reduce dependence on fossil fuels, a point that weighs on the environmental scale.</p>

<h3>How will this plant affect the local community and the region?</h3>

<p>Besides generating renewable energy, the project represents an investment of €1,237,547.62, which can boost the local economy and create jobs during construction.</p>

<p>But the evolution of social perception will have to be observed, especially regarding whether natural spaces and biodiversity are maintained.</p>

<h2>Pending procedures and authorizations</h2>

<h3>What administrative steps must the project overcome?</h3>

<p>The request is already in public information at the DOGC to obtain the prior administrative and construction authorization, together with the environmental impact assessment, mandatory for infrastructures of this scale.</p>

<p>These processes allow society and institutions to evaluate and, if necessary, present appeals or observations.</p>

<h3>When could the plant start operating?</h3>

<p>Once the legal steps are completed and all permits are in order, construction and commissioning will also depend on economic and logistical factors.</p>

<p>Everything points to the plant being active in 2027, but this depends on the speed of procedures and resource mobilization.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr>
			<td><strong>Number of panels</strong></td>
			<td>3,120</td>
		</tr>
		<tr>
			<td><strong>Total power</strong></td>
			<td>2.1 MW</td>
		</tr>
		<tr>
			<td><strong>Inverters</strong></td>
			<td>6</td>
		</tr>
		<tr>
			<td><strong>High-voltage line</strong></td>
			<td>1,414 m underground + 65 m aerial (25 kV)</td>
		</tr>
		<tr>
			<td><strong>Budget</strong></td>
			<td>€1,237,547.62</td>
		</tr>
	</tbody>
</table>

<p>The installation of this plant represents another step towards a more sustainable energy model, but not without generating local debate. The way the project is managed will mark the perception that the citizens of Salomó and the Tarragonès region have of it.</p>

<p>It is a clear example of how renewable energies directly impact the daily lives of people in the territory, bringing to the table the need for adaptation and active participation.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/08/2026070805282645850.jpg" length="139596" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/08/2026070805282645850.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Salomó prepares a solar plant with 3,120 panels and 2.1 MW of power: what will change in the territory?]]></media:title>
        <media:text><![CDATA[Salomó solar plant with 3,120 panels and 2.1 MW of power that will transform the local territory — AI-generated image]]></media:text>
        <media:description><![CDATA[Salomó solar plant with 3,120 panels and 2.1 MW of power that will transform the local territory — AI-generated image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Three wind farms with 36 wind turbines will affect Terra Alta and Ribera d’Ebre: what changes?]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/three-wind-farms-with-36-wind-turbines-will-affect-terra-alta-and-ribera-d-ebre-that-changes/20260708082048016778.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/three-wind-farms-with-36-wind-turbines-will-affect-terra-alta-and-ribera-d-ebre-that-changes/20260708082048016778.html#comentarios-16778</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/three-wind-farms-with-36-wind-turbines-will-affect-terra-alta-and-ribera-d-ebre-that-changes/20260708082048016778.html</guid>
  <pubDate>Wed, 8 Jul 2026 08:20:48 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[The Green Capital Development wind project installs 36 turbines and evacuation infrastructure in Terra Alta and Ribera d’Ebre. Details and local impacts.]]></description>
        <content:encoded><![CDATA[<p><strong>The environmental impact statement and prior authorization for three wind farms in Teruel and the evacuation infrastructure that will cross Terra Alta and Ribera d’Ebre are now open to public consultation.</strong> This Green Capital Development project includes 36 wind turbines distributed between Matarranya and Bajo Aragón-Caspe, with a total power exceeding 230 MW.</p>

<p>But what does this mean for the residents of the region? And how will it affect the landscape and daily life of the municipalities involved? Let’s take a closer look.</p>

<h2>The wind farms and their infrastructure</h2>

<h3>Which wind farms will be installed and exactly where?</h3>

<p>The project includes three wind farms:</p>

<ul>
	<li><strong>Paucali</strong>, with 9 wind turbines and 63 MW in Maella (Bajo Aragón-Caspe).</li>
	<li><strong>Arlo</strong>, with 10 turbines and 65.25 MW in Valldesgorfa, Massalió and Valljunquera (Matarranya).</li>
	<li><strong>Céfiro</strong>, with 17 turbines and 110.9 MW also in Massalió and Valljunquera.</li>
</ul>

<p>Additionally, an energy evacuation infrastructure will connect these farms, passing through municipalities in Terra Alta (Caseres, Batea, Vilalba dels Arcs, la Pobla de Massaluca and Fatarella) and Ribera d’Ebre (Flix and Ascó).</p>

<h3>How will these installations affect the territory and its inhabitants?</h3>

<p>The 36 wind turbines will significantly change the rural landscape, especially in areas with an agricultural and winemaking tradition. Moreover, the construction and maintenance of the evacuation infrastructure will involve machinery traffic and possible temporary disruptions to local mobility.</p>

<p>But what about renewable energy generation? This can represent an economic boost and employment opportunity, although it will inevitably generate debate among residents about the environmental and visual impact.</p>

<h2>Administrative procedure and citizen participation</h2>

<h3>What does the public consultation imply for residents and town halls?</h3>

<p>Public consultation is a key phase for citizens and local administrations to learn about, examine, and submit objections regarding the project and its environmental assessment.</p>

<p>The detailed reports on impact, possible corrective measures, and the layout of the evacuation lines are documents now available for consultation before the project is finally approved.</p>

<h3>How can objections be submitted and what are the expectations?</h3>

<p>Interested town halls and citizens have a set period to register their opinions and observations. This process may lead to modifications in the original project or strengthening of environmental protection measures.</p>

<p>Public debate and local opinion will be decisive for more consensual and balanced development.</p>

<h2>Energy context and impact on the region</h2>

<h3>Why is this project relevant for Terra Alta and Ribera d’Ebre?</h3>

<p>With a growing commitment to renewable energies, these wind farms will provide more than 230 MW, a significant figure that will contribute to reducing emissions and increase the green production capacity in the region.</p>

<p>The municipalities involved are also located in a strategic energy distribution zone, which could generate economic synergies and local development.</p>

<h3>What challenges and opportunities arise for the territory?</h3>

<p>The main challenge is to reconcile the energy transition with the preservation of natural and cultural heritage, as well as with traditional activities such as agriculture.</p>

<p>This requires careful planning and attentive listening to the voice of the territory, to avoid conflicts and make the renewable impulse also a social benefit.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Wind farm</th>
			<th>Wind turbines</th>
			<th>Power (MW)</th>
			<th>Location</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Paucali</strong></td>
			<td>9</td>
			<td>63</td>
			<td>Maella (Bajo Aragón-Caspe)</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Arlo</strong></td>
			<td>10</td>
			<td>65.25</td>
			<td>Valldesgorfa, Massalió and Valljunquera (Matarranya)</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Céfiro</strong></td>
			<td>17</td>
			<td>110.9</td>
			<td>Massalió and Valljunquera (Matarranya)</td>
		</tr>
	</tbody>
</table>

<p>The reality is that these energy projects are yet another example of how the territory adapts to new global needs, but also of the tension they generate at a local level. Residents, the environment, and politics will have to find a middle ground where sustainability is real and visible.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/08/2026070805282687456.jpg" length="66593" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/08/2026070805282687456.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Three wind farms with 36 wind turbines will affect Terra Alta and Ribera d’Ebre: what changes?]]></media:title>
        <media:text><![CDATA[Panoramic view of three wind farms with wind turbines that will transform Terra Alta and Ribera d’Ebre — AI-generated image]]></media:text>
        <media:description><![CDATA[Panoramic view of three wind farms with wind turbines that will transform Terra Alta and Ribera d’Ebre — AI-generated image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[One year since the Paüls fire in Xerta: changed landscape and aid that hasn’t arrived]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/any-foc-pauls-xerta-changed-landscape-and-arriving-aid/20260706115824015231.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/any-foc-pauls-xerta-changed-landscape-and-arriving-aid/20260706115824015231.html#comentarios-15231</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/any-foc-pauls-xerta-changed-landscape-and-arriving-aid/20260706115824015231.html</guid>
  <pubDate>Mon, 6 Jul 2026 11:58:24 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[One year since the fire that burned 30% of Xerta and the mayors demand forest cleaning and direct aid that is still missing.]]></description>
        <content:encoded><![CDATA[<p><strong>The Paüls fire devastated 30% of the Xerta municipal area, and recovery is still a mirage today.</strong> The mayor emphasizes that the landscape has changed radically and that the promise of direct aid and forest cleaning has not been fulfilled.</p>

<p>The frustration of the Baix Ebre mayors is palpable after a year of a fire that affected five municipalities and has left visible and invisible scars in the region.</p>

<h2>The pain and reality after the fire</h2>

<h3>How has Xerta changed after the fire?</h3>

<p>The fire burned 30% of Xerta’s area, leaving unrecognizable landscapes. Mayor Roger Aviñó acknowledges that a deep mourning had to take place for the loss. The burned trees and devastated areas still mark the municipality, and the feeling of abandonment is clear.</p>

<h3>What impact has it had on the local community?</h3>

<p>The local community experiences a double mourning: environmental loss and economic uncertainty. The farmers, directly affected, do not understand the administrative criteria for receiving aid, and the mayor of Aldover expresses it firmly: “Farmers do not understand wages or criteria made in an office.”</p>

<h2>Pending aid and compensations</h2>

<h3>What aid has actually arrived?</h3>

<p>So far, only the compensations for the declaration of a catastrophic zone have been received, and only for the most affected municipalities such as Xerta. Aldover, with less burned area, has not received even these compensations, leaving many neighbors in limbo.</p>

<h3>Why doesn’t the aid reach everyone?</h3>

<p>Administrative and bureaucratic criteria hinder access to aid. The burned surface limit excludes many affected people, especially farmers who depend on the land but do not fit the official parameters.</p>

<h2>The mayors’ urgent demand to the Government</h2>

<h3>What are the mayors asking for?</h3>

<p>They demand from the Government an urgent cleaning of the affected forests to prevent new fires and direct aid to reactivate the local economy and help the neighbors. The feeling is that they have been forgotten after the fire.</p>

<h3>How does this situation affect the residents of Baix Ebre?</h3>

<p>The lack of aid and support leaves residents in a precarious situation. Environmental and economic recovery is delayed, generating frustration and discouragement in a region that still carries the consequences of the fire.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Municipality</th>
			<th>Percentage of burned surface</th>
			<th>Aid received</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Xerta</strong></td>
			<td><strong>30%</strong></td>
			<td>Catastrophic zone compensations</td>
		</tr>
		<tr>
			<td>Aldover</td>
			<td>Below the limit</td>
			<td>No aid</td>
		</tr>
		<tr>
			<td>Other municipalities</td>
			<td>Variable</td>
			<td>Limited</td>
		</tr>
	</tbody>
</table>

<p>Source of the article: Anna Ferràs | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/06/2026070611580477268.jpg" length="293887" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/06/2026070611580477268.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[One year since the Paüls fire in Xerta: changed landscape and aid that hasn’t arrived]]></media:title>
        <media:text><![CDATA[Burnt and depopulated landscape after the year of fire from Paüls to Xerta with hopes of pending aid — Image from La Fuente]]></media:text>
        <media:description><![CDATA[Burnt and depopulated landscape after the year of fire from Paüls to Xerta with hopes of pending aid — Image from La Fuente]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Adif awards the Vila-seca gauge changer for the R16 between Tortosa and Barcelona for 23.3 million]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/adif-awards-for-233-million-gauge-changer-vila-seca-for-r16-between-tortosa-and-barcelona/20260704184016015114.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/adif-awards-for-233-million-gauge-changer-vila-seca-for-r16-between-tortosa-and-barcelona/20260704184016015114.html#comentarios-15114</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/adif-awards-for-233-million-gauge-changer-vila-seca-for-r16-between-tortosa-and-barcelona/20260704184016015114.html</guid>
  <pubDate>Sat, 4 Jul 2026 18:40:16 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Adif will invest 23.3 million in Vila-seca to guarantee the gauge change and the continuity of the R16 Rodalies line between Tortosa and Barcelona.]]></description>
        <content:encoded><![CDATA[<p><strong>Adif has allocated 23.33 million euros to build the Vila-seca gauge changer, a key infrastructure for the R16 to connect Tortosa and Barcelona without interruptions.</strong> This work is vital for the section between Castelló and Vila-seca to operate solely on standard gauge.</p>

<p>When the R16 trains arrive at Vila-seca, they will change gauge and maintain the usual coastal route. But why is this change so crucial for passengers?</p>

<h2>The infrastructure that will enable the continuity of the R16</h2>

<h3>What exactly is the Vila-seca gauge changer?</h3>

<p>The gauge changer is a facility that allows trains to switch from standard gauge to Iberian gauge without passengers having to change trains. This system is crucial for keeping the R16 line fully operational between Tortosa and Barcelona.</p>

<h3>Why is this work being awarded now for 23.3 million?</h3>

<p>The investment responds to the adaptation of the Mediterranean Corridor, which will make the Castelló-Vila-seca section operate only with standard gauge. This adaptation requires a gauge changer to avoid service breakages and ensure regional rail connectivity.</p>

<h2>Direct impact on users and the territory</h2>

<h3>How will the gauge changer affect R16 passengers?</h3>

<p>Trains will be able to run without interruptions by changing gauge at Vila-seca. Therefore, users will not have to make a manual transfer, which reduces time and inconvenience. This maintains a direct and comfortable link between Tortosa and Barcelona.</p>

<h3>What is the significance of this work for local connectivity?</h3>

<p>The continuity of the R16 service is key for mobility on the Catalan coast. This infrastructure ensures that the line remains competitive and functional, strengthening the connection of the territory with the Catalan capital and other intermediate points such as Sant Vicenç de Calders and Vilanova i la Geltrú.</p>

<h2>Technical and administrative details of the project</h2>

<h3>What other specific information do we know about this gauge changer?</h3>

<p>The gauge changer will be located in Vila-seca, with a budget of 23.33 million euros granted by Adif. This facility will be a strategic point to facilitate the transition between the different railway track gauges.</p>

<h3>When is it expected to become operational?</h3>

<p>There is no exact date yet, but the award implies that construction will start soon to adapt to the deployment of the Mediterranean Corridor planned for the coming years.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Characteristic</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Investment</strong></td>
			<td>23.33 million euros</td>
		</tr>
		<tr>
			<td>Location</td>
			<td>Vila-seca</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Function</strong></td>
			<td>Train gauge change (standard to Iberian)</td>
		</tr>
		<tr>
			<td>Service affected</td>
			<td>R16 Rodalies line (Tortosa-Barcelona)</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Objective</strong></td>
			<td>Guarantee continuity and comfort of service</td>
		</tr>
	</tbody>
</table>

<p>The project is not just another infrastructure, but symbolizes the commitment to keep rail as a viable and efficient option on the Costa Daurada and Camp de Tarragona.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/04/2026070418400685719.jpg" length="93311" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/04/2026070418400685719.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Adif awards the Vila-seca gauge changer for the R16 between Tortosa and Barcelona for 23.3 million]]></media:title>
        <media:text><![CDATA[Button to accept cookies that guarantees privacy and improves the users' browsing experience — Image from the Source]]></media:text>
        <media:description><![CDATA[Button to accept cookies that guarantees privacy and improves the users' browsing experience — Image from the Source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Ascó carries out a radiological control exercise with Mossos and CSN at four key points]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/asco-fa-exercise-radiologic-control-with-mossos-and-csn-four-key-points/20260703010330015054.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/asco-fa-exercise-radiologic-control-with-mossos-and-csn-four-key-points/20260703010330015054.html#comentarios-15054</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/asco-fa-exercise-radiologic-control-with-mossos-and-csn-four-key-points/20260703010330015054.html</guid>
  <pubDate>Fri, 3 Jul 2026 01:03:30 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Exercise at the Ascó nuclear power plant reviews doses received by staff and population. The CSN and Mossos guarantee safety in the face of nuclear emergencies.]]></description>
        <content:encoded><![CDATA[<p><strong>The radiation control exercise at the Ascó nuclear power plant involved reviewing doses received at four different access points.</strong> This drill, with the participation of the Mossos d'Esquadra and the Nuclear Safety Council (CSN), tested the response capacity in nuclear emergency situations.</p>

<p>Dose monitoring is key to protecting both the population and the personnel involved in these scenarios. But what does this exercise entail and how does it really affect the residents of Ascó? We explain it to you below.</p>

<h2>The importance of the exercise in Ascó</h2>

<h3>Why is it relevant for the local residents?</h3>

<p>The exercise is crucial because it evaluates preparedness for a possible nuclear emergency. Monitoring the doses received ensures that the population and intervention teams do not exceed established safety limits, an issue closely related to the region. Furthermore, it checks the coordination between local and state entities, an element that can make a difference in a real case.</p>

<h3>How was the drill organized?</h3>

<p>The CSN and the Mossos d'Esquadra coordinated a route that includes four strategic access points around the plant. Personalized dosimetric assignment was supervised and the police staff responsible for controlling these areas received specific training. The presence of the Government subdelegate in Tarragona, Elisabet Romero, and the CSN councilor, Silvia Calzón, underlined the institutional importance of the test.</p>

<h2>Technical details of dose monitoring</h2>

<h3>What is dose monitoring and how does it work?</h3>

<p>Dose monitoring measures exposure to ionizing radiation received by each person. These data are vital to avoid health risks and ensure that no one exceeds permitted limits. In the Ascó drill, the operation of the devices and the correct assignment of radiation levels to the intervention personnel were verified.</p>

<h3>Which access points were monitored?</h3>

<p>The four selected points are key to controlling how and how much radiation could reach people or emergency teams. These points are strategic passage and coordination points, chosen to guarantee exhaustive and effective coverage in case of a nuclear incident.</p>

<h2>Implications and follow-up after the exercise</h2>

<h3>What actions are expected after this drill?</h3>

<p>The results of dose monitoring will allow for protocol adjustments and improved personnel training. Additionally, coordination among the involved organizations will be reinforced to guarantee a faster and safer response should a real emergency ever arise.</p>

<h3>How does this affect the safety perception of Ascó inhabitants?</h3>

<p>This type of exercise strengthens public confidence in nuclear safety systems and law enforcement. Knowing there is rigorous control and specific training about radiation helps reduce anxiety and uncertainty. Thus, the community can feel more at ease, although vigilance can never be lowered.</p>

<p><strong>Ascó has taken another step to demonstrate that nuclear safety is a real and constant commitment.</strong> Dose monitoring and the direct involvement of the Mossos and the CSN highlight the need to maintain active vigilance and ongoing training. When your health and that of your environment is at stake, there is no room for errors.</p>

<p>Article source: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070301024983595.jpg" length="100238" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070301024983595.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Ascó carries out a radiological control exercise with Mossos and CSN at four key points]]></media:title>
        <media:text><![CDATA[Button to accept cookies and manage privacy consent for a better web browsing experience — Source Image]]></media:text>
        <media:description><![CDATA[Button to accept cookies and manage privacy consent for a better web browsing experience — Source Image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Unió de Pagesos denounces overcosts of up to €10,000 for diesel in beekeeping in Barcelona]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-denounce-overcosts-up-to-10000-E-for-diesel-beekeeping-barcelona/20260703010116015052.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-denounce-overcosts-up-to-10000-E-for-diesel-beekeeping-barcelona/20260703010116015052.html#comentarios-15052</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-denounce-overcosts-up-to-10000-E-for-diesel-beekeeping-barcelona/20260703010116015052.html</guid>
  <pubDate>Fri, 3 Jul 2026 01:01:16 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[The beekeeping sector demands diesel subsidies due to the price increase caused by the Middle East crisis and warns of 65% losses due to the Asian wasp.]]></description>
        <content:encoded><![CDATA[<p><strong>Beekeeping is on the edge due to the rise in diesel prices, which means between 800 and 10,000 euros more per operation.</strong> This figure is not just any data: it hits directly in the pocket of beekeepers in Barcelona, who are excluded from the aid that other agricultural sectors do receive.</p>

<p>The crisis in the Middle East drives up fuel prices, and those who suffer the most are the ones who have to move constantly to maintain the bees and honey production. Moreover, the Asian hornet adds another headache with losses that can reach up to 65%.</p>

<h2>Urgent claims from the beekeeping sector in Barcelona</h2>

<h3>Why is this support crucial for local beekeepers?</h3>

<p>Beekeepers in Barcelona do not just work the land, but also the air, often moving to ensure pollination. Without aid, the cost of diesel rises to unsustainable levels, putting the survival of many operations at risk.</p>

<h3>What specific figures does Unió de Pagesos handle?</h3>

<ul>
	<li><strong>800 euros</strong> in additional costs for small operations, with 150 hives.</li>
	<li><strong>Up to 10,000 euros</strong> for large operations, with 1,500 hives.</li>
</ul>

<h2>Direct impact of the Asian hornet on production</h2>

<h3>How does the Asian hornet affect beekeeping operations?</h3>

<p>The Asian hornet causes a drop of up to 65% in honey production, a double blow that combined with the rising diesel prices shakes the sector.</p>

<h3>What measures do beekeepers’ associations propose?</h3>

<p>They demand specific diesel subsidies, comparable to those of other agricultural sectors, and an effective control plan against the Asian hornet to prevent further losses.</p>

<h2>Institutional response and the future of the sector</h2>

<h3>Why is beekeeping excluded from diesel aid?</h3>

<p>According to Unió de Pagesos, there is clear "discrimination" against beekeeping, despite the vital need for travel to maintain bees and pollination.</p>

<h3>What consequences could this situation have for consumers?</h3>

<p>The increase in costs could translate into less honey and higher prices, as well as an environmental impact due to the possible reduction of local pollination. This scenario affects the entire food chain and the agricultural landscape of Barcelona.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070301004928982.jpg" length="205270" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070301004928982.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Unió de Pagesos denounces overcosts of up to €10,000 for diesel in beekeeping in Barcelona]]></media:title>
        <media:text><![CDATA[Report from Unió de Pagesos on diesel cost overruns in beekeeping in Barcelona with impact on small producers — Source image]]></media:text>
        <media:description><![CDATA[Report from Unió de Pagesos on diesel cost overruns in beekeeping in Barcelona with impact on small producers — Source image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[3 million euros to reinforce agroforestry systems in Terres de l’Ebre and Priorat]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/3-million-euros-to-strengthen-agroforestry-systems-in-the-terres-l-ebre-and-priorat/20260703005946015050.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/3-million-euros-to-strengthen-agroforestry-systems-in-the-terres-l-ebre-and-priorat/20260703005946015050.html#comentarios-15050</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/3-million-euros-to-strengthen-agroforestry-systems-in-the-terres-l-ebre-and-priorat/20260703005946015050.html</guid>
  <pubDate>Fri, 3 Jul 2026 00:59:46 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[A 3 MEUR project promotes agroforestry resilience in the regions affected by denuclearization over the next three years.]]></description>
        <content:encoded><![CDATA[<p><strong>The Government allocates 3 million euros to a project to improve agroforestry resilience in Terres de l’Ebre, Priorat, Baix Camp, and southern Lleida.</strong> This initiative aims to strengthen agricultural systems in the face of the climate crisis and energy transition in areas affected by denuclearization.</p>

<p>The project, called 'Living Agroforestry Mosaics,' is led by the l’Aube Association and will be deployed over three years with the objective of analyzing, preventing risks, and generating local bioeconomy.</p>

<h2>What does the "Living Agroforestry Mosaics" project entail?</h2>

<h3>Why is it key for the affected regions?</h3>

<p>The regions that have experienced the loss of nuclear activity need to strengthen their adaptive capacity. This project acts directly on agroforestry systems to make them more resilient to climatic and economic impacts.</p>

<h3>What actions are planned to be implemented?</h3>

<ul>
	<li>Detailed analysis of agroforestry systems to identify vulnerabilities.</li>
	<li>Risk prevention and management associated with the climate crisis.</li>
	<li>Preservation of local biodiversity to guarantee ecological balance.</li>
	<li>Promotion of the bioeconomy as a sustainable source of income.</li>
</ul>

<h2>How will this project affect the involved territories?</h2>

<h3>What changes can the inhabitants of Terres de l’Ebre and Priorat expect?</h3>

<p>The territories may see an increase in the sustainability of their agroforestry operations, with fewer climate risks and more economic opportunities linked to the bioeconomy.</p>

<h3>How will the investment and deployment be distributed over time?</h3>

<p>The investment of 3 million euros will be distributed over three years, with progressive interventions in the regions of southern Lleida, Baix Camp, Priorat, and Terres de l’Ebre.</p>

<h2>What relevance does this project have within the energy transition?</h2>

<h3>How does it fit with the Nuclear Transition Funds?</h3>

<p>The project is part of the Nuclear Transition Funds promoted by the Department of Business and Labor, a tool to mitigate the social and economic impact of the disappearance of nuclear activity in these regions.</p>

<h3>What long-term impact can it have?</h3>

<p>The initiative can set a sustainable model of rural and agroforestry development that helps stabilize the local economy and favor biodiversity, as well as prepare the territories for future climate challenges.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Region</th>
			<th>Type of action</th>
			<th>Expected duration</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Terres de l’Ebre</strong></td>
			<td>Risk analysis and prevention</td>
			<td>3 years</td>
		</tr>
		<tr>
			<td>Southern Lleida</td>
			<td>Biodiversity preservation</td>
			<td>3 years</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Priorat</strong></td>
			<td>Bioeconomy generation</td>
			<td>3 years</td>
		</tr>
		<tr>
			<td>Baix Camp</td>
			<td>Integrated agroforestry measures</td>
			<td>3 years</td>
		</tr>
	</tbody>
</table>

<p>For the inhabitants of the affected regions, this economic and knowledge injection is more than aid: it is an opportunity to reinvent themselves and face a more sustainable and resilient future.</p>

<p>Source of the article: Editorial Staff | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483415552.jpg" length="122528" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483415552.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[3 million euros to reinforce agroforestry systems in Terres de l’Ebre and Priorat]]></media:title>
        <media:text><![CDATA[Farmers and managers from Terres de l’Ebre and Priorat receive 3 million euros to strengthen sustainable agroforestry systems — Image generated by AI]]></media:text>
        <media:description><![CDATA[Farmers and managers from Terres de l’Ebre and Priorat receive 3 million euros to strengthen sustainable agroforestry systems — Image generated by AI]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Unemployment in Tarragona and the Ebre remains stable with 35,559 people seeking work in June]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/l-atur-tarragona-and-l-ebre-remain-stable-with-35559-people-looking-for-work-june/20260703005802015048.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/l-atur-tarragona-and-l-ebre-remain-stable-with-35559-people-looking-for-work-june/20260703005802015048.html#comentarios-15048</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/l-atur-tarragona-and-l-ebre-remain-stable-with-35559-people-looking-for-work-june/20260703005802015048.html</guid>
  <pubDate>Fri, 3 Jul 2026 00:58:02 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Unemployment hardly changes in Tarragona and Ebre in June. Social Security affiliation grows by 2.75% with 374,643 contributors.]]></description>
        <content:encoded><![CDATA[<p><strong>Unemployment in the Tarragona and Ebre regions remains almost unchanged in June 2026, with 35,559 people actively seeking work.</strong> Despite the near stability compared to the previous month, the figure reflects a slight annual decrease that is of interest to anyone looking closely.</p>

<p>Social Security affiliation grows by 2.75%, reaching 374,643 contributors, indicating a positive movement in the local labor market that does not always come to light.</p>

<h2>Unemployment stability in Tarragona and the Ebre: what does it mean for residents?</h2>

<h3>How has unemployment evolved in June 2026?</h3>

<p>Unemployment in Tarragona, Baix Penedès, and Terres de l’Ebre has experienced a minimal reduction of 8 people compared to May, representing a 0.02% decrease. Compared to June 2025, the drop in unemployment is more significant, at 2.83%, with 1,034 fewer people registered as unemployed.</p>

<h3>Why is this stability relevant for the inhabitants?</h3>

<p>Because it reflects a labor market that is not deteriorating, relieving social and economic pressure. This means that <em>despite global difficulties, the local situation holds</em> without worsening, and this marks the difference for families and professionals seeking opportunities.</p>

<h2>Social Security affiliation: a barometer of labor activity in the region</h2>

<h3>How many workers are currently contributing in Tarragona and the Ebre?</h3>

<p>Data indicate that 374,643 people are affiliated with Social Security in the Tarragona and Ebre regions. This figure represents an increase of 2.74% in one year (10,000 more contributors) and a 1.55% rise compared to May (5,734 more affiliates).</p>

<h3>How does this increase affect local economic dynamics?</h3>

<p>The increase in contributors is a sign that more people are working or that jobs remain active. For the reader, this implies an indirect improvement in quality of life and in local consumption capacity, key factors in economic recovery.</p>

<h2>Context and labor perspectives in Tarragona and Terres de l’Ebre</h2>

<h3>Which sectors drive this employment movement?</h3>

<p>Although concrete data by sector are not detailed, the increase in affiliates may be related to tourism activities, services, and local industry, usually economic drivers of the area during summer. These activities largely condition labor opportunities.</p>

<h3>What questions do citizens ask about the labor future?</h3>

<p>Residents wonder if this trend will continue and how it will affect their ability to find stable employment. There is also interest in knowing if local institutions will do anything to promote employment beyond this apparent stability.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Indicator</th>
			<th>June 2025</th>
			<th>May 2026</th>
			<th>June 2026</th>
			<th>Variation June 2025-2026</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>People unemployed</strong></td>
			<td>36,593</td>
			<td>35,567</td>
			<td>35,559</td>
			<td>-2.83% (-1,034)</td>
		</tr>
		<tr>
			<td><strong>Social Security affiliates</strong></td>
			<td>364,643</td>
			<td>368,909</td>
			<td>374,643</td>
			<td>+2.74% (+10,000)</td>
		</tr>
	</tbody>
</table>

<p>The table shows in detail the slight reduction in unemployment and the sustained growth of social affiliation, data that deserve attention from both political leaders and local economic agents.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070300573772146.jpg" length="82023" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070300573772146.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Unemployment in Tarragona and the Ebre remains stable with 35,559 people seeking work in June]]></media:title>
        <media:text><![CDATA[People near employment in Tarragona and the Ebre remain stable with 35,559 unemployed in June 2024 — Source image]]></media:text>
        <media:description><![CDATA[People near employment in Tarragona and the Ebre remain stable with 35,559 unemployed in June 2024 — Source image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Why do Ecologists in Action and CGT reject the AI gigafactory in Móra la Nova?]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/why-ecologists-action-and-cgt-reject-gigafactory-of-ai-mora-nova/20260703005607015046.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/why-ecologists-action-and-cgt-reject-gigafactory-of-ai-mora-nova/20260703005607015046.html#comentarios-15046</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/why-ecologists-action-and-cgt-reject-gigafactory-of-ai-mora-nova/20260703005607015046.html</guid>
  <pubDate>Fri, 3 Jul 2026 00:56:07 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Activists warn that the AI gigafactory in Móra la Nova will not generate stable employment or prosperity for the Ribera d’Ebre.]]></description>
        <content:encoded><![CDATA[<p><strong>Ecologistes en Acció and CGT reject the installation of an artificial intelligence gigafactory in Móra la Nova due to the impact it will have on local resources and the economy.</strong> This debate has alerted the inhabitants and social actors of Ribera d’Ebre, who see this project more as a threat than an opportunity.</p>

<p>The issue is clear: <strong>an industry that consumes too much energy and water but does not create stable employment cannot be a real driver of local development.</strong> And this is precisely what the activists denounce.</p>

<h2>Rejection of the AI gigafactory in Móra la Nova</h2>

<h3>What are the main arguments of Ecologistes en Acció and CGT?</h3>

<p>Both entities warn that these artificial intelligence data centers <em>"drain the territory's energy and water resources"</em>, without bringing any real benefit to Ribera d’Ebre. Furthermore, they argue that the installation of these infrastructures will make it impossible for other industries that could offer quality employment and job stability to develop.</p>

<h3>How would this affect local economic development?</h3>

<p>For the activists, the gigafactory will not be an economic attraction pole but an obstacle. These types of facilities have intense energy consumption and do not require a large workforce; therefore, they do not generate a true industrial fabric nor benefits for the residents.</p>

<h2>The plan they demand for Ribera d’Ebre</h2>

<h3>What do CGT and Ecologistes en Acció propose?</h3>

<p>The main demand is an industrial development plan that goes beyond speculation with technologies that do not generate jobs. They want a plan that promotes stable and quality employment, serving to make Ribera d’Ebre a zone of genuine prosperity for its population.</p>

<h3>Why is this plan crucial for the territory?</h3>

<p>In a context of energy and economic crisis, <strong>betting on a model that consumes resources without returning local benefits can condemn the area to stagnation.</strong> Therefore, management and planning are key to avoiding situations where the territory is only a space for exploitation.</p>

<h2>Impacts and future perspectives of the gigafactory</h2>

<h3>What environmental risks does the installation imply?</h3>

<p>The main risk is the pressure on natural resources, especially water and electricity. These facilities consume large amounts of energy and cooling, which can affect water supply and increase the local ecological footprint.</p>

<h3>What could happen if the project goes ahead unchanged?</h3>

<p>If approved as is, Ribera d’Ebre could see its traditional industrial fabric pushed to the background, while the gigafactory does not bring the expected prosperity. This could generate frustration and social tensions, in addition to long-term environmental problems.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Potential Impact</th>
			<th>Comment</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Energy consumption</strong></td>
			<td>High</td>
			<td>Could overload the local electrical grid</td>
		</tr>
		<tr>
			<td><strong>Water consumption</strong></td>
			<td>Elevated</td>
			<td>Pressure on scarce water resources</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Jobs created</strong></td>
			<td>Low</td>
			<td>Small and unstable workforce</td>
		</tr>
		<tr>
			<td><strong>Local benefits</strong></td>
			<td>Limited</td>
			<td>No direct social or economic return</td>
		</tr>
	</tbody>
</table>

<p>The reality is that this debate highlights the need for a fairer and more sustainable economic model in Ribera d’Ebre, one that does not leave prosperity only for a few.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483327450.jpg" length="110648" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483327450.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Why do Ecologists in Action and CGT reject the AI gigafactory in Móra la Nova?]]></media:title>
        <media:text><![CDATA[Demonstration by Ecologists in Action and CGT against the artificial intelligence gigafactory in Móra la Nova for environmental and social reasons — AI-generated image]]></media:text>
        <media:description><![CDATA[Demonstration by Ecologists in Action and CGT against the artificial intelligence gigafactory in Móra la Nova for environmental and social reasons — AI-generated image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Works on the TV-3421 between Roquetes and Mas de Barberans with 3.3 MEUR: widened bridge and pacified crossing]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/works-tv-3421-between-roquetes-and-mas-barberans-with-33-meur-bridge-widened-and-calmed-crossroad/20260703005501015044.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/works-tv-3421-between-roquetes-and-mas-barberans-with-33-meur-bridge-widened-and-calmed-crossroad/20260703005501015044.html#comentarios-15044</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/works-tv-3421-between-roquetes-and-mas-barberans-with-33-meur-bridge-widened-and-calmed-crossroad/20260703005501015044.html</guid>
  <pubDate>Fri, 3 Jul 2026 00:55:01 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Work begins on the TV-3421 road to improve safety with bridge expansion and calming of the urban crossing. Fourteen months of work.]]></description>
        <content:encoded><![CDATA[<p><strong>The Diputació de Tarragona has started key works on the TV-3421 road between Roquetes and Mas de Barberans.</strong> With a budget of 3.3 million euros, this intervention will significantly change the safety and mobility of the area.</p>

<p>If you have recently passed through TV-3421, you will know that it is not the best road for comfortable driving. The planned changes will not only improve traffic flow, but will also impact the daily lives of those who live or work in these municipalities. The occasional traffic closures will require attention, but the result will be worthwhile.</p>

<h2>Details of the works and planned measures</h2>

<h3>What exactly does the intervention on TV-3421 include?</h3>

<p>The work, which will last fourteen months, includes:</p>

<ul>
	<li><strong>Calming of the urban stretch of Mas de Barberans</strong>, to reduce speed and improve pedestrian and vehicle safety.</li>
	<li><strong>Expansion of the bridge over the Sant Antoni ravine</strong>, improving the capacity and safety of the infrastructure.</li>
	<li><strong>Improvements to the layout</strong> at specific points, with platform widening in narrow areas and correction of turns with poor visibility.</li>
	<li><strong>Stabilization of unstable or eroded slopes</strong> to ensure ground stability and prevent landslides.</li>
	<li><strong>Creation of pedestrian routes</strong> in the urban sections, facilitating safe walking mobility.</li>
</ul>

<h3>How will traffic be affected during the works?</h3>

<p>The works will require occasional traffic closures, which will be announced in advance. This may cause inconvenience, but it is expected to be short-lived and the coordination will be optimal to avoid congestion. Users will need to pay attention to notices to adapt to temporary changes.</p>

<h2>Local impact and political assessment</h2>

<h3>How important is this work for the region?</h3>

<p>For the people of Roquetes and Mas de Barberans, this investment of 3.3 million euros is good news. The TV-3421 road is a vital axis connecting two important municipalities of Montsià and Baix Ebre, with daily traffic and a history of safety problems. <strong>Improving this route means reducing accident risks and facilitating daily life.</strong></p>

<h3>Who is driving and endorsing this project?</h3>

<p>The work is led by the Diputació de Tarragona, with the visible presence of Iris Castell, Deputy for Territorial Infrastructure, and the mayors Ivan Garcia (Roquetes) and Daniela Lleixà (Mas de Barberans). This political support helps ensure that the works meet expectations and are carried out on time and properly.</p>

<h2>Technical aspects and future outlook</h2>

<h3>What technical improvements are planned for the road?</h3>

<p>The widening of the platform in narrow areas and correction of turns with poor visibility are key to adapting the road to the current volume and type of traffic. Unstable slopes will also be addressed, avoiding risks of landslides and unexpected closures. This implies a safer and more stable road in the long term.</p>

<h3>How long will the works last and what is expected afterwards?</h3>

<p>With a planned duration of fourteen months, this renovation will keep TV-3421 under construction for a good season. <em>Patience, it will be worth it.</em> Once finished, the route will offer a safer and more comfortable driving experience, and pedestrians will be able to move more safely in the urban sections.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Description</th>
			<th>Expected Duration</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Budget</strong></td>
			<td>3.3 million euros</td>
			<td rowspan="4">14 months</td>
		</tr>
		<tr>
			<td><strong>Sant Antoni Bridge</strong></td>
			<td>Expansion and structural reinforcement</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Urban stretch</strong></td>
			<td>Calming and safety improvement</td>
		</tr>
		<tr>
			<td><strong>Road improvements</strong></td>
			<td>Platform widening, curve correction, slope stabilization</td>
		</tr>
	</tbody>
</table>

<p>The works on TV-3421 are not just another infrastructure intervention. <strong>They represent a boost for the safety and mobility of a key area of Montsià</strong> that until now suffered from evident deficiencies. Coordination between institutions and municipalities will be crucial to prevent temporary inconveniences from overshadowing the final benefit.</p>

<p>If you pass through Roquetes or Mas de Barberans, prepare to see changes that, in the long run, will make the road a safer place for both drivers and pedestrians. <em>A project not only seen on the asphalt but in quality of life.</em></p>

<p><strong>The improvement works on TV-3421 are a clear example of how a local investment can transform the daily experience and safety of an entire region.</strong> With 3.3 million euros and a plan that includes structural and urban improvements, the road between Roquetes and Mas de Barberans will change, and a lot.</p>

<div class="faq-section">
<h2>Frequently Asked Questions</h2>

<dl>
	<dt>When will the works on TV-3421 start and how long will they last?</dt>
	<dd>The works have already started and are expected to last fourteen months with occasional traffic closures.</dd>
	<dt>What improvements will be made to the bridge over the Sant Antoni ravine?</dt>
	<dd>The bridge will be expanded and reinforced to ensure greater safety and capacity for vehicle passage.</dd>
	<dt>How will calming the urban stretch in Mas de Barberans affect traffic?</dt>
	<dd>It will reduce traffic speed and improve the safety of pedestrians and drivers in this urban area.</dd>
</dl>
</div>

<p>Article source: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070300544122786.jpg" length="254814" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/03/2026070300544122786.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Works on the TV-3421 between Roquetes and Mas de Barberans with 3.3 MEUR: widened bridge and pacified crossing]]></media:title>
        <media:text><![CDATA[Improvement works on the TV-3421 road between Roquetes and Mas de Barberans with bridge expansion and crossroad pacification — Image from the source]]></media:text>
        <media:description><![CDATA[Improvement works on the TV-3421 road between Roquetes and Mas de Barberans with bridge expansion and crossroad pacification — Image from the source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Repowering of the Tortosa wind farm: 3 large turbines in the protected Cardó-Boix area without a fauna study]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/repowering-wind-farm-tortosa-3-large-turbines-protected-area-thistle-box-without-fauna-study/20260703005320015042.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/repowering-wind-farm-tortosa-3-large-turbines-protected-area-thistle-box-without-fauna-study/20260703005320015042.html#comentarios-15042</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/repowering-wind-farm-tortosa-3-large-turbines-protected-area-thistle-box-without-fauna-study/20260703005320015042.html</guid>
  <pubDate>Fri, 3 Jul 2026 00:53:20 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[GEPEC-EdC warns that the Baix Ebre wind farm project in Tortosa has not submitted the wildlife study, key to protecting Cardó-Boix.]]></description>
        <content:encoded><![CDATA[<p><strong>GEPEC-EdC warns that the repowering of the Baix Ebre wind farm in Tortosa poses a serious impact on the protected natural area of Cardó-Boix.</strong> The proposal maintains the power but would multiply production by 3.7, with only 3 giant wind turbines replacing the current 27.</p>

<p>However, what concerns environmentalists the most is that the fauna study, essential to assess the effects on local biodiversity, has not been presented. And this, close to home, is a warning that cannot be ignored.</p>

<h2>The repowering project of the Baix Ebre wind farm in Tortosa</h2>

<h3>What exactly does the company Parc Eòlic del Baix Ebre SA propose?</h3>

<p>The company PEBESA wants to replace the 27 current wind turbines, dating from 1995 and about 100 meters high, with 3 large-scale turbines. Although the nominal power would be maintained at 4.05 MW, energy production could be multiplied by 3.7, according to data provided by GEPEC-EdC.</p>

<h3>Why is this repowering of interest to the park managers?</h3>

<p>The technological leap would notably increase production with fewer units, theoretically reducing visual impact and maintenance complexity. But the reality is that the size and concentration of the turbines can have more aggressive effects on the territory and fauna.</p>

<h2>The impact on the protected natural area Serres de Cardó-Boix</h2>

<h3>How does this project affect Cardó-Boix?</h3>

<p>The wind farm is located within the area protected by the Natura 2000 Network, a place that hosts vulnerable species and habitats. The presence of large turbines can alter ecosystems and cause conflicts with environmental conservation.</p>

<h3>What concerns do environmentalists have?</h3>

<p>GEPEC-EdC denounces that no fauna study has been presented, which is <em>fundamental</em> to understand the impact of the wind turbines on local species, especially birds and other animals sensitive to the presence of turbines.</p>

<h2>The project's requirements and shortcomings according to GEPEC-EdC</h2>

<h3>What does GEPEC-EdC say about the lack of a fauna study?</h3>

<p>The environmental group insists that without this study the protection of biodiversity cannot be guaranteed and that the lack of information casts doubt on the environmental viability of the project.</p>

<h3>What measures do they demand to proceed with the project?</h3>

<p>They demand the immediate presentation of a detailed fauna study and a review of environmental impacts to ensure that the repowering does not endanger the natural values of Cardó-Boix.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Current situation</th>
			<th>Repowering project</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Number of wind turbines</strong></td>
			<td>27 small turbines</td>
			<td>3 large turbines</td>
		</tr>
		<tr>
			<td><strong>Nominal power</strong></td>
			<td>4.05 MW</td>
			<td>4.05 MW (maintained)</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Estimated production</strong></td>
			<td>Current baseline</td>
			<td>Multiplied by 3.7</td>
		</tr>
		<tr>
			<td><strong>Fauna study</strong></td>
			<td>Not applicable</td>
			<td>Not presented (denounced)</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Location</strong></td>
			<td>Baix Ebre wind farm</td>
			<td>Protected area Serres de Cardó-Boix</td>
		</tr>
	</tbody>
</table>

<p>Source of the article: Editorial Team | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483239067.jpg" length="106596" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/07/02/2026070222483239067.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Repowering of the Tortosa wind farm: 3 large turbines in the protected Cardó-Boix area without a fauna study]]></media:title>
        <media:text><![CDATA[Repowering of the Tortosa wind farm with three large mills in the Cardó-Boix protected area without an environmental fauna study — Image generated by AI]]></media:text>
        <media:description><![CDATA[Repowering of the Tortosa wind farm with three large mills in the Cardó-Boix protected area without an environmental fauna study — Image generated by AI]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Móra d'Ebre allocates 6.5 million to expand 16 hectares of the La Verdeguera industrial estate]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/mora-d-ebre-allocates-65-million-to-expand-16-hectares-poligon-verdeguera/20260629182009014961.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/mora-d-ebre-allocates-65-million-to-expand-16-hectares-poligon-verdeguera/20260629182009014961.html#comentarios-14961</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/mora-d-ebre-allocates-65-million-to-expand-16-hectares-poligon-verdeguera/20260629182009014961.html</guid>
  <pubDate>Mon, 29 Jun 2026 18:20:09 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Móra d'Ebre will invest 6,535,000 euros from the Nuclear Transition Fund to expand the La Verdeguera industrial park with 16 hectares of industrial land.]]></description>
        <content:encoded><![CDATA[<p><strong>Móra d'Ebre will allocate 6.5 million euros to expand 16 hectares of the La Verdeguera industrial estate.</strong> This action aims to boost local economic development and attract new companies to the municipality.</p>

<p>This initiative comes after meetings between the Town Hall and INCASÒL to define key details of the third phase of the estate. The proposal already generates business interest to occupy 40% of the new plots.</p>

<h2>Key details of the third phase of the La Verdeguera estate</h2>

<h3>What area will be expanded and who owns it?</h3>

<p>The third phase will add 16 hectares of industrial land for new companies and expansions. INCASÒL owns 66% of this area, which facilitates the management and development of the project.</p>

<h3>How will this expansion be financed?</h3>

<p>The Nuclear Transition Fund will provide 6,535,000 euros to make the expansion possible, an economic boost aimed at revitalizing the local industrial sector and generating employment.</p>

<h2>Economic impact and opportunities for Móra d’Ebre</h2>

<h3>Why is this expansion important for the municipality?</h3>

<p>The increase of industrial land is key to attracting companies and generating economic growth. The current business interest, with an expected 40% occupancy, forecasts a revitalization of the local productive fabric.</p>

<h3>Which sectors could benefit from the new area?</h3>

<p>Although specific sectors are not detailed, the expansion opens the door to companies from different industrial fields looking to establish themselves or expand their activities in the area.</p>

<h2>Process and next steps for implementation</h2>

<h3>Which phases will the project follow from now on?</h3>

<p>After these initial meetings, technical and urban planning details will be defined to begin construction and marketing of the industrial land. Collaboration between public entities is decisive.</p>

<h3>When is the new land expected to be available to companies?</h3>

<p>There are no concrete dates yet, but the intention is to expedite the process to take advantage of the opportunity the Nuclear Transition Fund investment represents, a key factor for a rapid startup.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Expanded area</strong></td>
			<td>16 hectares</td>
		</tr>
		<tr>
			<td><strong>INCASÒL ownership percentage</strong></td>
			<td>66%</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Nuclear Fund investment</strong></td>
			<td>6,535,000 euros</td>
		</tr>
		<tr>
			<td><strong>Current business interest</strong></td>
			<td>40% expected occupancy</td>
		</tr>
	</tbody>
</table>

<p>The reality is that this expansion could mark a turning point for Móra d’Ebre, responding to the demand for industrial spaces and generating new job and business opportunities. The coordinated management between the Town Hall and INCASÒL and the financial support from the Nuclear Fund create a promising scenario for the future industrial development of the municipality.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/29/2026062915533517285.jpg" length="146214" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/29/2026062915533517285.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Móra d'Ebre allocates 6.5 million to expand 16 hectares of the La Verdeguera industrial estate]]></media:title>
        <media:text><![CDATA[Expansion of the La Verdeguera industrial park in Móra d’Ebre with an investment of 6.5 million for 16 new hectares — AI-generated image]]></media:text>
        <media:description><![CDATA[Expansion of the La Verdeguera industrial park in Móra d’Ebre with an investment of 6.5 million for 16 new hectares — AI-generated image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Unió de Pagesos requests a count and orderly removal of vineyards in Valls and the Camp de Tarragona]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-demand-count-and-ordered-uprooting-vineyards-valleys-and-countryside-tarragona/20260629180307014959.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-demand-count-and-ordered-uprooting-vineyards-valleys-and-countryside-tarragona/20260629180307014959.html#comentarios-14959</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/unio-farmers-demand-count-and-ordered-uprooting-vineyards-valleys-and-countryside-tarragona/20260629180307014959.html</guid>
  <pubDate>Mon, 29 Jun 2026 18:03:07 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Unió de Pagesos calls for urgent measures to reduce the stock of grapes and balance supply and demand in the face of the drop in global wine consumption.]]></description>
        <content:encoded><![CDATA[<p><strong>Unió de Pagesos calls for a thorough vineyard census and an orderly uprooting to save the wine sector of Catalonia.</strong> This request comes at a time when overproduction and the decline in global wine consumption threaten the sustainability of local farmers.</p>

<p>The situation is of particular concern to farmers in the Camp de Tarragona, where grape stock has skyrocketed and measures to balance the market must be urgently taken.</p>

<h2>The challenge of grape stock in Catalonia</h2>

<h3>Why is it crucial to carry out a vineyard census?</h3>

<p>Having an updated registry of vineyards allows understanding the reality of the crop and adjusting supply to demand, an essential step to avoid the excess grapes suffocating the market.</p>

<p>Without this information, any action to rebalance the sector will be a shot in the dark, and this could endanger many farmers who depend exclusively on wine.</p>

<h3>How does this situation affect farmers in the Camp de Tarragona?</h3>

<p>The farmers of Valls and the rest of the region suffer the direct consequences of accumulated stock: falling prices and difficulties maintaining the viability of their farms.</p>

<p>Unió de Pagesos has taken this concern to the regional Agricultural offices, seeking an immediate and forceful response.</p>

<h2>The request for a social and orderly uprooting</h2>

<h3>What does a social and orderly uprooting of vineyards mean?</h3>

<p>It involves a planned and agreed removal of vineyards to adjust production to actual demand, avoiding abrupt measures that could generate social and economic conflicts.</p>

<p>The union argues that this uprooting must be fair and respectful to the affected farmers to ensure a sustainable future for the sector.</p>

<h3>What are the main reasons explaining this crisis?</h3>

<p>The decline in global wine consumption, climate change, and geopolitical tensions have reduced demand and, therefore, caused an overproduction that the market cannot absorb.</p>

<p>For this reason, coordinated action is necessary to balance the situation and prevent more farmers from being trapped in a saturated market.</p>

<h2>Impact and outlook for the local wine sector</h2>

<h3>How is the initiative perceived within the agricultural community?</h3>

<p>The initiative by Unió de Pagesos has gained notable support among farmers who see in these measures a hope to reverse the crisis.</p>

<p>However, there are reservations due to fears of losing arable land and uncertainties regarding economic compensation.</p>

<h3>What actions are expected from the Department of Agriculture?</h3>

<p>Farmers have delivered a letter to the regional Agricultural offices in El Vendrell, Falset, Valls, Gandesa, and Tàrrega, demanding clear measures and an immediate action plan.</p>

<p>The institutional response will mark the sector’s future, as it is necessary to establish a regulatory framework that allows managing the problem effectively.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Vineyard census</strong></td>
			<td>Measure to know the real extent and adjust supply</td>
		</tr>
		<tr>
			<td><strong>Orderly uprooting</strong></td>
			<td>Planned removal to avoid conflicts and guarantee social justice</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Causes of the crisis</strong></td>
			<td>Decline in consumption, climate change, and geopolitical factors</td>
		</tr>
		<tr>
			<td><strong>Affected areas</strong></td>
			<td>Camp de Tarragona, Valls, El Vendrell, Falset, Gandesa, Tàrrega</td>
		</tr>
	</tbody>
</table>

<p>Source of the article: Mar Rovira | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/29/2026062918025025339.jpg" length="95084" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/29/2026062918025025339.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Unió de Pagesos requests a count and orderly removal of vineyards in Valls and the Camp de Tarragona]]></media:title>
        <media:text><![CDATA[Farmers gathered debating the orderly uprooting of vineyards in Valls and the Camp de Tarragona in response to the demand for recount — Image from the Source]]></media:text>
        <media:description><![CDATA[Farmers gathered debating the orderly uprooting of vineyards in Valls and the Camp de Tarragona in response to the demand for recount — Image from the Source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[The Tarragona tourism sector receives the Tour de France but sees little direct economic impact]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/tourism-sector-tarragona-rep-tour-france-has-little-direct-economic-impact/20260628225354014937.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/tourism-sector-tarragona-rep-tour-france-has-little-direct-economic-impact/20260628225354014937.html#comentarios-14937</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/tourism-sector-tarragona-rep-tour-france-has-little-direct-economic-impact/20260628225354014937.html</guid>
  <pubDate>Sun, 28 Jun 2026 22:53:54 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Tarragona’s tourism entrepreneurs appreciate the image of the Tour de France but foresee little additional income for hotels and restaurants during the event.]]></description>
        <content:encoded><![CDATA[<p><strong>The Tour de France arrives in Tarragona with anticipation and doubts about the real impact on the local economy.</strong> Despite the festive atmosphere and media coverage, tourism businesses do not expect a significant increase in income, as the city is already full in the high season.</p>

<p>The Tarragona tourism sector experiences this sporting event with some contradiction, as it positions the city on the international stage but does not seem to translate into clear economic benefits for local businesses.</p>

<h2>Tourism sector reaction to the Tour de France</h2>

<h3>Why is the Tour de France of interest to Tarragona if it doesn't bring revenue?</h3>

<p>The image and positioning that the Tour de France represents are considered by local business owners as an intangible value, much more than immediate income. Although hotels are already full due to the high season, hosting this sporting event reinforces Tarragona’s visibility as a tourist destination.</p>

<h3>How do hoteliers assess the influx of visitors for the event?</h3>

<p>Hoteliers acknowledge that they cannot determine how many guests come specifically because of the race, as reservations do not reflect the reason for the stay. This makes it difficult to quantify the direct economic impact the event may have on accommodation.</p>

<h2>Impact on restaurateurs and local businesses</h2>

<h3>Why do restaurateurs expect the event not to generate significant income?</h3>

<p>Most restaurateurs suspect that fans will not have meals at their establishments but will prefer to consume drinks or fast food. This limits the economic impact the race could generate in the restaurant sector.</p>

<h3>What are the expectations of other local businesses during the Tour?</h3>

<p>Other businesses linked to tourism and leisure see the event as an opportunity to reinforce their presence in the city but do not expect a notable increase in sales. The high season already ensures generally high occupancy.</p>

<h2>Perspectives and official calculations post Tour</h2>

<h3>When and how will the economic impact of the Tour in Tarragona be calculated?</h3>

<p>The City Council has announced that it will carry out an economic assessment once the event has ended, incorporating data on attendance and consumption. This analysis will be key to determining whether the media projection translates into tangible benefits.</p>

<h3>What added value does Tarragona bring with the Tour de France in a global tourism context?</h3>

<p>The city reinforces its image as a sports and tourist meeting point, which can have positive long-term effects on the perception of Tarragona, beyond the immediate income during the event.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Expected Impact</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Hotels</strong></td>
			<td>Full occupancy due to high season; direct impact difficult to measure</td>
		</tr>
		<tr>
			<td><strong>Restaurants</strong></td>
			<td>Limited income; few meals consumed by fans</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>City image</strong></td>
			<td>High; long-term benefit for tourist positioning</td>
		</tr>
	</tbody>
</table>

<p>The reality is that the Tour de France is more a showcase than an immediate economic engine for Tarragona. But what about you, how do you see it? Is this the formula to attract quality tourism or just a passing spectacle?</p>

<p>The debate remains open as Tarragona prepares to be the stage of a sporting event which, although it may not fill the coffers right now, could open doors for the city in the not-too-distant future.</p>

<p><strong>Frequently Asked Questions</strong></p>

<dl>
	<dt>Will the Tour de France increase hotel revenues in Tarragona?</dt>
	<dd>Hotels expect to be full due to the high season but cannot confirm that the Tour will bring more specific reservations.</dd>
	<dt>Do restaurateurs see significant economic benefits during the event?</dt>
	<dd>They anticipate few extra revenues because they believe fans will not have meals at their premises.</dd>
	<dt>When will the real economic impact of the Tour in Tarragona be measured?</dt>
	<dd>The City Council will conduct an evaluation once the event is over to determine the real impact.</dd>
</dl>

<p>Article source: Arnau Martínez | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/28/2026062822533166385.jpg" length="147692" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/28/2026062822533166385.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[The Tarragona tourism sector receives the Tour de France but sees little direct economic impact]]></media:title>
        <media:text><![CDATA[Panoramic view of the roads of Tarragona with Tour de France cyclists riding and little visible economic activity in the background — Image from the Source]]></media:text>
        <media:description><![CDATA[Panoramic view of the roads of Tarragona with Tour de France cyclists riding and little visible economic activity in the background — Image from the Source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[La Ràpita drives the blue economy with 20 actions until 2035]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/rapita-drives-the-blue-economy-with-20-actions-until-2035/20260626182544014840.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/rapita-drives-the-blue-economy-with-20-actions-until-2035/20260626182544014840.html#comentarios-14840</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/rapita-drives-the-blue-economy-with-20-actions-until-2035/20260626182544014840.html</guid>
  <pubDate>Fri, 26 Jun 2026 18:25:44 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[La Ràpita presents a project with an investment of more than 1,000 MEUR to turn the Alfacs bay into the first OMEC of the Mediterranean.]]></description>
        <content:encoded><![CDATA[<p><strong>La Ràpita is betting on a strategic project that promises to transform the economy of the Ebro Delta with twenty key actions and an investment exceeding 1 billion euros.</strong> This initiative aims to turn the Alfacs Bay into a global model of conservation and sustainable development recognized by the United Nations.</p>

<p>Many will wonder: how can such a sensitive territory balance environmental protection and economic growth? Here is the answer.</p>

<h2>The blue economy project in La Ràpita</h2>

<h3>What does promoting the blue economy in the Ebro Delta involve?</h3>

<p>The blue economy refers to the sustainable use of marine and coastal resources for economic activities. In the Delta, this proposal includes around twenty actions that combine innovation, environmental conservation, and economic growth to ensure a viable future.</p>

<h3>Why is Alfacs Bay key to this initiative?</h3>

<p>Alfacs Bay is protected but also an important economic asset. Turning it into the first MEDC (Mediterranean Marine Economic Community) means making ecosystem preservation compatible with activities such as sustainable fishing, responsible tourism, and scientific research.</p>

<h2>Details of the investment and project execution</h2>

<h3>What is the budget and expected duration?</h3>

<p>The plan has a budget that could exceed 1 billion euros, with an execution horizon until 2035. This scale of investment is unprecedented in the region and opens new employment and business opportunities.</p>

<h3>What are the most notable strategic actions?</h3>

<ul>
	<li>Protection and restoration of natural habitats.</li>
	<li>Promotion of sustainable fishing.</li>
	<li>Development of environmentally friendly tourist activities.</li>
	<li>Boosting technological innovation applied to the marine environment.</li>
	<li>Creation of internationally recognized experimentation and conservation zones.</li>
</ul>

<h2>Local impact and global commitment</h2>

<h3>How will this affect the residents of La Ràpita and the Delta?</h3>

<p>Residents will be able to enjoy a more dynamic and sustainable economy, with new jobs and improved services related to tourism and fishing. Moreover, the conservation of the territory guarantees long-term quality of life.</p>

<h3>When is the international ratification of the project expected?</h3>

<p>The application to make Alfacs Bay a MEDC will be submitted at the United Nations summit scheduled for late 2027, a key step to obtain global recognition and support.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Planned Investment</strong></td>
			<td>Over 1 billion euros</td>
		</tr>
		<tr>
			<td><strong>Duration</strong></td>
			<td>Until 2035</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Actions</strong></td>
			<td>About twenty strategic interventions</td>
		</tr>
		<tr>
			<td><strong>International Goal</strong></td>
			<td>First Mediterranean MEDC</td>
		</tr>
	</tbody>
</table>

<p>Source of the article: Editorial staff | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618251835654.jpg" length="138768" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618251835654.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[La Ràpita drives the blue economy with 20 actions until 2035]]></media:title>
        <media:text><![CDATA[La Ràpita promotes the sustainable development of the blue economy with projects until 2035 — Image source]]></media:text>
        <media:description><![CDATA[La Ràpita promotes the sustainable development of the blue economy with projects until 2035 — Image source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[400 km cut along the Tour route between Tarragona and Osona]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/400-km-cut-route-tour-between-tarragona-and-osona/20260626182416014838.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/400-km-cut-route-tour-between-tarragona-and-osona/20260626182416014838.html#comentarios-14838</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/400-km-cut-route-tour-between-tarragona-and-osona/20260626182416014838.html</guid>
  <pubDate>Fri, 26 Jun 2026 18:24:16 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[The Tour cuts 400 km of roads on Sunday and Monday. C-32 toll free on Sunday and reinforcement of FGC. Disruptions on the Costa Daurada and inland.]]></description>
        <content:encoded><![CDATA[<p><strong>The Tour de France will cause road closures over nearly 400 kilometers between Tarragona and Osona.</strong> For two days, Sunday and Monday, coastal and inland roads will be closed, affecting about sixty municipalities and altering usual mobility.</p>

<p>If you had plans for this weekend, it’s best to review them: the closed roads and the free toll on the C-32 will define the day, with possible traffic jams and changes in public transport.</p>

<h2>Closures and free tolls: how the Tour will affect Tarragona and Barcelona</h2>

<h3>Which roads will be closed on Sunday, July 5?</h3>

<p>For five hours, from 11 a.m. to 4 p.m., important roads along the coastal corridor, especially the N-340 and the C-31, will be closed, affecting traffic between Tarragona and Barcelona. This closure coincides with the massive influx to the beaches, so prepare for traffic jams or look for alternative routes.</p>

<h3>What is the most notable measure to facilitate mobility?</h3>

<p>The toll on the C-32 will be free during the stage from Tarragona to Barcelona, to alleviate congestion and encourage use of this route during the closure of the main roads.</p>

<h2>Impacts in Osona and Ripollès: what will happen on Monday?</h2>

<h3>Which roads should be considered inland?</h3>

<p>On the working day Monday, the impacts will focus on the C-59, the C-17 from La Gleva, the N-260, and other Pyrenean roads, especially in the counties of Osona and Ripollès. The route between Granollers and Les Angles will close for the race.</p>

<h3>How will it affect work and daily mobility?</h3>

<p>The closures may cause delays in usual commutes, and public transport will also reinforce some lines, especially FGC, to compensate for road restrictions and increased demand.</p>

<h2>Transport reinforcement and local recommendations</h2>

<h3>How will public transport be reinforced during the Tour?</h3>

<p>FGC will reinforce several lines over the weekend to facilitate access and redistribute mobility, especially between Tarragona and Barcelona. This can be a good option to avoid traffic jams and delays for those traveling to the city or beaches.</p>

<h3>What alternatives do local drivers have during these two days?</h3>

<p>It is recommended to plan routes in advance, avoid the most affected closure points, and use secondary roads or public transport. Residents and visitors should consider that mobility will be limited and patience will be a good ally.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Day</th>
			<th>Road sections closed</th>
			<th>Closure duration</th>
			<th>Affected municipalities</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td>Sunday, July 5</td>
			<td>N-340, C-31, free C-32 toll</td>
			<td>11:00 - 16:00</td>
			<td>Sixty municipalities between Tarragona and Barcelona</td>
		</tr>
		<tr>
			<td>Monday, July 6</td>
			<td>C-59, C-17 (at La Gleva), N-260 and Pyrenean roads</td>
			<td>During working hours</td>
			<td>Osona and Ripollès</td>
		</tr>
	</tbody>
</table>

<p>Article source: Laura Fíguls / Pol Solà | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618235394368.jpg" length="331155" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618235394368.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[400 km cut along the Tour route between Tarragona and Osona]]></media:title>
        <media:text><![CDATA[Detailed map with the 400 kilometers cut by the Tour route between Tarragona and Osona in full activity — Image from La Fuente]]></media:text>
        <media:description><![CDATA[Detailed map with the 400 kilometers cut by the Tour route between Tarragona and Osona in full activity — Image from La Fuente]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Catalonia will invest 3,000 million EUR until 2040 to modernize irrigation systems]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/catalonia-will-invest-3000-meur-until-2040-to-modernize-irrigation/20260626182253014836.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/catalonia-will-invest-3000-meur-until-2040-to-modernize-irrigation/20260626182253014836.html#comentarios-14836</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/catalonia-will-invest-3000-meur-until-2040-to-modernize-irrigation/20260626182253014836.html</guid>
  <pubDate>Fri, 26 Jun 2026 18:22:53 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Catalonia will allocate 3,000 MEUR to modernize 181,000 hectares of irrigated land with photovoltaic energy and improvements in Ponent and the Urgell canal.]]></description>
        <content:encoded><![CDATA[<p><strong>Catalonia plans to invest 3.090 billion euros to modernize 181,000 hectares of irrigated land by 2040.</strong> This plan focuses on photovoltaic installations to lower energy costs and improve the sector's sustainability.</p>

<p>The modernization of irrigation systems is key to ensuring a more efficient use of water and maintaining agricultural production in one of the country’s most productive areas. But what does this mean for the locals and the local economy?</p>

<h2>Investment details and priority areas</h2>

<h3>Which areas in Catalonia are affected?</h3>

<p>The investment affects 181,000 hectares of irrigated land, with special attention to Ponent, where nearly 1 billion EUR will be dedicated to the Urgell canal and 30 million EUR annually to the Segarra-Garrigues canal. This focus responds to the agricultural importance of these counties and the need to update old infrastructures.</p>

<h3>What exactly does the modernization include?</h3>

<p>The plan includes not only the renewal of irrigation systems but also the installation of photovoltaic panels to reduce energy costs. This aspect is key to making irrigation more sustainable and less dependent on fossil fuels.</p>

<h2>Local social and economic impact</h2>

<h3>How will it affect farmers and locals?</h3>

<p>These investments promise to improve water management and reduce energy expenses, which can help maintain or increase crop profitability. Moreover, modernization opens the door to new job opportunities in the construction and maintenance of these infrastructures.</p>

<h3>What is the economic impact on the region?</h3>

<p>With more than 3 billion EUR invested over 15 years, the generated economic movement will be significant. The improvement of irrigation systems is expected to enhance the competitiveness of the agricultural sector, one of the economic pillars of Ponent, and to contribute to stabilizing the rural population.</p>

<h2>Environmental and technological aspects</h2>

<h3>Why is the incorporation of photovoltaic energy relevant?</h3>

<p>The implementation of solar panels is a step toward more environmentally friendly irrigation, reducing carbon footprint and energy costs. This makes the project not only a physical improvement but also a commitment to sustainability.</p>

<h3>What environmental challenges may arise?</h3>

<p>Despite the benefits, the expansion of irrigation systems can cause tensions on water resources if not properly managed. Controlling water use and ensuring sustainable renewal will be key to avoiding future problems.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Total investment</strong></td>
			<td>3.090 billion EUR until 2040</td>
		</tr>
		<tr>
			<td><strong>Hectares affected</strong></td>
			<td>181,000</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Main areas</strong></td>
			<td>Urgell canal, Segarra-Garrigues</td>
		</tr>
		<tr>
			<td><strong>Renewable energy</strong></td>
			<td>Installation of photovoltaic panels</td>
		</tr>
	</tbody>
</table>

<p>The transformation of irrigation systems is an ambitious challenge that could shape Catalonia’s agricultural and energy future, especially in Ponent. The question remains whether this effort will translate into a real and positive impact for the inhabitants and the environment.</p>

<p>The announced investment not only modernizes infrastructure but also opens the door to a more sustainable and efficient model, which could serve as an example for other agricultural areas in the country. We will closely follow the progress of these projects and the impact they have on the lands that help feed us.</p>

<p><strong>Frequently Asked Questions</strong></p>

<div class="faq-section">
<h2>Frequently Asked Questions</h2>

<dl>
	<dt>What are the main areas where irrigation investments will be made?</dt>
	<dd>Investments are concentrated in Ponent, especially in the Urgell canal and the Segarra-Garrigues canal, which will receive the majority of the funds.</dd>
	<dt>How will the installation of photovoltaic panels affect costs?</dt>
	<dd>It will help reduce energy expenses, making the irrigation system more sustainable and less dependent on conventional energy.</dd>
	<dt>What economic impact will this modernization have?</dt>
	<dd>It will generate local economic activity, improve agricultural competitiveness, and create jobs in construction and maintenance.</dd>
</dl>
</div>

<p>Article source: Anna Berga | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618222587247.jpg" length="135047" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/26/2026062618222587247.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Catalonia will invest 3,000 million EUR until 2040 to modernize irrigation systems]]></media:title>
        <media:text><![CDATA[Catalonia will allocate 3 billion euros until 2040 for the sustainable modernization of agricultural irrigation — Image source]]></media:text>
        <media:description><![CDATA[Catalonia will allocate 3 billion euros until 2040 for the sustainable modernization of agricultural irrigation — Image source]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Campredó prepares biogas plant with 93 GW/h of renewable gas]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/campredo-prepares-biogas-plant-with-93-gw-h-renewable-gas/20260625234238014831.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/campredo-prepares-biogas-plant-with-93-gw-h-renewable-gas/20260625234238014831.html#comentarios-14831</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/campredo-prepares-biogas-plant-with-93-gw-h-renewable-gas/20260625234238014831.html</guid>
  <pubDate>Thu, 25 Jun 2026 23:42:38 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[Campredó promotes a biomethane plant that will produce 93 GWh annually and inject bioCO2 into the gas network. Learn about the project and the planned investment.]]></description>
        <content:encoded><![CDATA[<p><strong>Campredó will host a biogas plant capable of generating 93 GW/h annually of renewable gas.</strong> This project will not only produce clean energy but will also reuse 127,000 tons of organic waste to inject bioCO2 into the gas network.</p>

<p>The BIO SALAS SL plant installed in Tortosa represents a clear commitment to the local energy transition with a new 300-meter infrastructure and a budget close to 308,000 euros.</p>

<h2>Project details and its local impact</h2>

<h3>What does this plant mean for Campredó and the region?</h3>

<p>Producing renewable gas on an industrial scale here means reducing dependence on fossil fuels and managing agricultural and livestock waste sustainably. For residents, it means a direct impact on environmental management and possibly an improvement in the local economy due to new job opportunities.</p>

<h3>How will the gas be injected into the network and what is the cost?</h3>

<p>A 300-meter infrastructure will connect the plant to the RAA-08 network with an investment of 307,823.02 euros. This connection is key to ensuring that the biomethane and bioCO2 generated reach the end users.</p>

<h2>Processes and production capacity of the BIO SALAS SL plant</h2>

<h3>What raw materials will the project use?</h3>

<p>The center will process 127,000 tons of slurry, poultry manure, pruning residues, and other organic waste. This mixture is essential for anaerobic fermentation that generates biomethane and bioCO2, closing local recycling cycles.</p>

<h3>What is the expected energy capacity?</h3>

<p>With a forecast of 93 GW/h annually, the plant can supply renewable energy equivalent to thousands of homes. This volume is a remarkable milestone for a facility of this size.</p>

<h2>Environmental impact and future of the project</h2>

<h3>How does this project affect sustainability in the area?</h3>

<p>It contributes to the reduction of greenhouse gases by reusing waste and substituting fossil fuels. This makes the project a clear example of circular economy applied to the territory.</p>

<h3>What steps follow after public approval?</h3>

<p>Once the public information phase is closed, connection works and start-up will be carried out. The plant is expected to begin operation in the coming months, marking a tangible energy change.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Area</strong></td>
			<td>85,000 m²</td>
		</tr>
		<tr>
			<td><strong>Annual production</strong></td>
			<td>93 GW/h biomethane and bioCO2</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Waste treated</strong></td>
			<td>127,000 tons (slurry, poultry manure, pruning)</td>
		</tr>
		<tr>
			<td><strong>Connection infrastructure</strong></td>
			<td>300 meters</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Budget</strong></td>
			<td>€307,823.02</td>
		</tr>
	</tbody>
</table>

<p>This BIO SALAS SL project is a tangible example of how the region can lead renewable energy production and manage waste in a practical and profitable way.</p>

<p>The plant not only provides energy but also turns waste that was once a problem into an opportunity. This means that, in addition to the environmental impact, the initiative can generate employment and economic activity in the area.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/25/2026062521382414721.jpg" length="91736" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/25/2026062521382414721.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Campredó prepares biogas plant with 93 GW/h of renewable gas]]></media:title>
        <media:text><![CDATA[Biogas plant in Campredó producing 93 GW/h of renewable gas for a sustainable and ecological future — Image generated by AI]]></media:text>
        <media:description><![CDATA[Biogas plant in Campredó producing 93 GW/h of renewable gas for a sustainable and ecological future — Image generated by AI]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Dow workers warn: 138 layoffs in Tarragona]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/dow-workers-warn-138-layoffs-tarragona/20260625234142014829.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/dow-workers-warn-138-layoffs-tarragona/20260625234142014829.html#comentarios-14829</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/dow-workers-warn-138-layoffs-tarragona/20260625234142014829.html</guid>
  <pubDate>Thu, 25 Jun 2026 23:41:42 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[The Dow Tarragona committee proposes a table with the Generalitat to avoid layoffs in the industrial decarbonization of the chemical sector.]]></description>
        <content:encoded><![CDATA[<p><strong>Workers at Dow Chemical Tarragona warn that the future of the chemical sector is at stake if industrial decarbonization is not supported.</strong> The Tarragona plant faces the risk of losing 138 jobs if the administration does not act.</p>

<p>David Navarro, president of the works council, calls for an urgent response and proposes creating a working group with the Generalitat to prevent job losses. They want to avoid a situation similar to Germany, where 5,000 layoffs have already been recorded since 2022.</p>

<h2>The situation of the chemical sector in Tarragona</h2>

<h3>What is happening in the Camp de Tarragona with Dow Chemical?</h3>

<p>The chemical sector in Tarragona is going through a critical moment. The Dow Chemical plant plans to lay off 138 workers if public aid for the energy transition is not obtained. This industry, key to the local economy, needs support to adapt to decarbonization.</p>

<h3>Why is public support vital right now?</h3>

<p>Without subsidies, the shift to more sustainable processes can entail high costs that companies cannot bear. This puts employment at risk and could cause Tarragona to lose too many jobs in a strategic sector.</p>

<h2>The works council’s proposal and the institutional response</h2>

<h3>How do they want to avoid the layoffs?</h3>

<p>The works council has formally proposed a joint working group between Dow Chemical and the Generalitat. The goal is to coordinate efforts to guarantee job continuity and secure resources to enable decarbonization without job losses.</p>

<h3>What is the position of the Parliament and political groups?</h3>

<p>During the meeting at Parliament, various groups heard the council’s demands. Pressure is growing for institutions to take a step forward and offer concrete aid to prevent Tarragona from suffering a labor and economic shock similar to Germany’s.</p>

<h2>Local impact and future scenario</h2>

<h3>How would this scenario affect residents?</h3>

<p>The loss of 138 jobs at Dow Chemical would have a domino effect in the region. Less income, less consumption, and a possible economic downturn in related sectors. The local society faces a crucial challenge to preserve its industrial activity.</p>

<h3>What alternatives are being considered to ensure viability?</h3>

<p>If the working group succeeds, aid and industrial reconversion plans could arrive to maintain employment. Initiatives are also being discussed to modernize the plant and make it more competitively sustainable.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Aspect</th>
			<th>Detail</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Number of planned layoffs</strong></td>
			<td>138 workers</td>
		</tr>
		<tr>
			<td><strong>Comparison with Germany</strong></td>
			<td>5,000 layoffs since 2022</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Initiative</strong></td>
			<td>Creation of a working group with the Generalitat</td>
		</tr>
		<tr>
			<td><strong>Objective</strong></td>
			<td>Avoid layoffs and promote decarbonization</td>
		</tr>
	</tbody>
</table>

<p>The chemical sector crisis in Tarragona is a warning that cannot be ignored. The combination of environmental demands and lack of public support puts a considerable number of jobs at risk. What happens in the coming months will mark the industrial and social future of the Camp de Tarragona.</p>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/25/2026062523411950349.jpg" length="92012" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/25/2026062523411950349.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Dow workers warn: 138 layoffs in Tarragona]]></media:title>
        <media:text><![CDATA[Dow workers in Tarragona warn of 138 possible layoffs if an urgent solution is not found — Source image]]></media:text>
        <media:description><![CDATA[Dow workers in Tarragona warn of 138 possible layoffs if an urgent solution is not found — Source image]]></media:description>
      </media:content>
        </item>
                        <item>
  <title><![CDATA[Exports from Camp de Tarragona grow by 14% in April]]></title>
      <category><![CDATA[Economy]]></category>
    <link>https://www.modernetdigital.cat/en/articulo/finance/exports-camp-tarragona-grow-14-in-april/20260624181203014764.html</link>
  <comments>https://www.modernetdigital.cat/en/articulo/finance/exports-camp-tarragona-grow-14-in-april/20260624181203014764.html#comentarios-14764</comments>
  <guid>https://www.modernetdigital.cat/en/articulo/finance/exports-camp-tarragona-grow-14-in-april/20260624181203014764.html</guid>
  <pubDate>Wed, 24 Jun 2026 18:12:03 +0200</pubDate>
      <dc:creator><![CDATA[Júlia Gual]]></dc:creator>
        <description><![CDATA[The Camp de Tarragona and the Terres de l’Ebre boost exports to 1.040 billion euros in March, led by chemical products.]]></description>
        <content:encoded><![CDATA[<p><strong>Exports from companies in the Camp de Tarragona and Terres de l’Ebre areas grew by 14% in April, surpassing 1,040 million euros.</strong> This increase stands out compared to the rest of Catalonia, where Barcelona only recorded an 8.5% growth.</p>

<p>The figure is surprising, especially as it reflects a clear boost in a key sector that dominates the area, the chemical sector, which accounts for more than 40% of foreign sales. But what does all this mean for our local economy?</p>

<h2>Details of export growth in Tarragona</h2>

<h3>What drives the 14% increase in April?</h3>

<p>The main engine of this growth has been the chemical products sector, which with 418.2 million euros in exports grew by 15.4%. This sector has a fundamental weight in the province and explains much of the overall increase.</p>

<h3>Which other sectors stand out in foreign sales?</h3>

<p>Beyond chemicals, consumer manufactures have increased exports by 49.1%, reaching 156.7 million euros. This growth reflects the economic diversification of the area and its ability to compete abroad.</p>

<h2>Comparison with other Catalan provinces</h2>

<h3>How does Tarragona compare with Barcelona and the rest of Catalonia?</h3>

<p>Tarragona and Terres de l’Ebre lead export growth in Catalonia with 14%, well above Barcelona’s 8.5%. This figure is relevant because Barcelona has always been the economic powerhouse of Catalonia.</p>

<h3>What factors explain this difference in growth?</h3>

<p>The weight of the chemical sector, which is highly developed in Tarragona, and the increase in manufactures explain the difference. In addition, proximity to ports and logistics reinforce local competitiveness.</p>

<h2>Local impact and future challenges</h2>

<h3>Why is this growth important to the residents of Tarragona and l’Ebre?</h3>

<p>This export increase creates employment and economic dynamism in the region. It also drives investments and improves the international image of the territory, which could attract more companies and projects.</p>

<h3>What are the main challenges to maintaining this pace?</h3>

<p>It will be necessary to address the sustainability of the production model, innovation, and professional training. Also, adapting to global fluctuations and maintaining the logistical infrastructure in excellent condition.</p>

<table border="1" cellpadding="8" cellspacing="0">
	<tbody>
		<tr bgcolor="#e0e0e0">
			<th>Sector</th>
			<th>Exports April 2026 (€ million)</th>
			<th>Growth (%)</th>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Chemical products</strong></td>
			<td><strong>418.2</strong></td>
			<td><strong>15.4</strong></td>
		</tr>
		<tr>
			<td>Consumer manufactures</td>
			<td>156.7</td>
			<td>49.1</td>
		</tr>
		<tr>
			<td>Other sectors</td>
			<td>465.4</td>
			<td>Less relevant</td>
		</tr>
		<tr bgcolor="#d4edda">
			<td><strong>Total Camp de Tarragona and Terres de l’Ebre</strong></td>
			<td><strong>1,040.3</strong></td>
			<td><strong>14.0</strong></td>
		</tr>
	</tbody>
</table>

<p>Source of the article: Editorial | ACN</p>
]]></content:encoded>
                    <enclosure url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/24/2026062418115178607.jpg" length="112141" type="image/jpeg"/>
      <media:content url="https://www.modernetdigital.cat/media/modernetdigital/images/2026/06/24/2026062418115178607.jpg" type="image/jpeg" medium="image">
        <media:title><![CDATA[Exports from Camp de Tarragona grow by 14% in April]]></media:title>
        <media:text><![CDATA[14% increase in exports from Camp de Tarragona in April with outstanding commercial figures — Image from the source]]></media:text>
        <media:description><![CDATA[14% increase in exports from Camp de Tarragona in April with outstanding commercial figures — Image from the source]]></media:description>
      </media:content>
        </item>
          </channel>
</rss>

